|
APPLIES TO:
Oracle
Application Install - Version 11.5.10.2 to 12.1.3 [Release 11.5.10 to 12.1]
Information
in this document applies to any platform.
GOAL
The
purpose of this note is to give the guidance, the brief answers to
these same (frequent) questions submited by The customers to Supports,
related to the CPU/Critical Patches.
Nb:
The note has been written a few years ago, why the example
supplied was on EBS 11i.
Example
of the questions
In
TEST instance, I just finished CPU Oct 2005. As most patches, except for
E-Business, are cumulative I ask the question :
Can I take the most recent April CPU 2008, apply
those cumulative patches, and go back to the Jan 2006 CPU and apply
E-Business patches, and come forward?
FIX
On 11i :
1) On EBS 11i, the CPU patches are
not Cumulative (opposite to ATG patches which are cumulative), you have to
apply the CPU patches and forward.
Example
applying CPU patch 2005, 2006 ,2007, 2008 and until 2009.
The
logical steps, customers should(must) apply the previous critical patch
updates and Oracle security alerts related to Oracle E-Business
Suite before applying the "last" critical patch
update".
2.3.5
Oracle E-Business Suite Release 11i Patches
Critical
Update patches for Oracle E-Business Suite Release 11i are generally not
cumulative, which means that fixes from earlier critical patch updates
and Oracle security alerts are not included in the patches.
Customers
must apply the previous critical patch updates and Oracle
security alerts related to
Oracle
E-Business Suite before applying this critical patch update.
For a
list of earlier security alerts and CPUs related to Oracle E-Business
Suite, see OracleMetaLink
Note
315713.1: Prior Oracle E-Business Suite
Security Alerts and Critical Patch Updates.
You
should apply "any Oracle Applications Technology CPU patches"
before applying corresponding patches for other Oracle E-Business Suite
products listed by versions.
The
patch lists in Table 9 show the patches in this order, with Oracle
Applications Technology patches appearing first.
Example
=======
Read The Note
315713.1, there is a special column there for
"11.5.10.2". If the value is Y => You have to apply that
CPU patch
2)Further details on Applying the CPU, Critical Patches,
please review :Note.757511.1 Oracle Critical Patch Update Jan 2009 Documentation
Map.
Note
880170.1 Title: Oracle E-Business Suite
Releases 11i and 12 Critical Patch Update Knowledge Document
3)
Please read other interesting notes related to AD.I. and ATG RUP topic.
Note
783600.1 Title: About Oracle Applications
Technology 11i.ATG_PF.H.delta.7
Oracle Applications Technology 11i.ATG_PF.H.delta.7
is cumulative, in that everything found in Oracle Applications
Technology 11i.ATG_PF.H Rollup 3 (4334965), Oracle Applications Technology
11i.ATG_PF.H Rollup 4 (4676589), Oracle Applications Technology
11i.ATG_PF.H.delta.5 (RUP5) (5473858), and Oracle Applications Technology
11i.ATG_PF.H.delta.6 (RUP6) (5903765) is also included in
11i.ATG_PF.H.delta.7
Oracle
Applications DBA minipack 11i.AD.I.7 (7429271) replaces Oracle Applications
DBA minipack 11i.AD.I.6 (6502082). Minipack 11i.AD.I.7 contains 11i.AD.I.2
and patches 4502904, 4605654, 5161680, 6502079 and 7429248. If you have
already applied 11i.AD.I.2, then, you need only apply patch 7429271 to update
your system.
You can safely move from 11i.AD.I.2 to 11i.AD.I.7.
On R12.x :
1- Oppose to the 11i, in R12, The CPU Patches are
cumulative.
See details in the Note
880170.1
Note:
CPU patches listed in this knowledge document for Oracle E-Business Suite
Release 12 (12.0 and 12.1), Oracle Database, and Oracle Fusion Middleware are
cumulative, which means that fixes from previous Oracle security alerts and
Critical Patch Updates are included. This
is in contrast with Oracle E-Business Suite Release 11i, where CPU patches
are not cumulative.
2- For
the Latest 2012 CPU Patches, please refer to the notes below.
Oracle E-Business Suite Releases 11i and 12 Critical
Patch Update Knowledge Document (April 2012) Document
1406263.1.
Oracle E-Business Suite Releases 11i and 12 Critical
Patch Update Knowledge Document (January 2012) Document
1384016.1.
Nb: If
there is the specific question on the RDBMS CPU Patches, you would please
create a new SR (service Request) to the RDBMS Team.
How to Upgrade a
E-Business Suite R12 Database From 11.2.0.3 RAC to 12c RAC Including CRS
Upgrade (RAC-to-RAC Upgrade) (Doc ID 2095920.1)
|
Oracle E-Business
Suite Release 12.2: Upgrading to Oracle Database 12c with Existing Physical
Standby (Doc ID 2093158.1)
Currently We have two instances :
- 1 : Oracle EBS R12.2.5 having database
11.2.0.4 on linux 64 bit (standalone server)
- 2 : Oracle EBS R12.1.3 having database
11.2.0.4 on linux 64 bit (standalone server)
Interoperability Notes Oracle EBS 12.2
with Oracle Database 12c Release 1 (Doc ID 1926201.1) - For scenario 1
Database
Preparation Guidelines for an E-Business Suite Release 12.1 Upgrade (Doc ID
761570.1)
|
REFERENCES
NOTE:315713.1 - Prior E-Business Suite Security Alerts
NOTE:360470.1 - Security Alerts and Critical Patch Updates -
Frequently Asked Questions
NOTE:233044.1 - About Oracle Applications DBA Minipack 11i.AD.I
NOTE:605117.1 - Oracle E-Business Suite Critical Patch Update
Note July 2008
NOTE:738921.1 - Oracle E-Business Suite Releases 11i and 12
Critical Patch Update Note (October 2008)
NOTE:757511.1 - Oracle Critical Patch Update Jan 2009
Documentation Map
NOTE:783600.1 - About Oracle Applications Technology
11i.ATG_PF.H.delta.7 (RUP 7)
NOTE:1271167.1 - Oracle E-Business Suite Releases 11i and 12
Critical Patch Update Knowledge Document (January 2011)
NOTE:1406263.1 - Oracle E-Business Suite Releases 11i and 12
Critical Patch Update Knowledge Document (April 2012)
|
All of the blogs are for my own reference only .
//Ranjit
No comments:
Post a Comment